Turangi and Tokaanu pipeline renewals
$3.2M of water and wastewater pipeline renewals are scheduled for Turangi and Tokaanu in 2019.
The water renewals include 5.4km of water mains, rider mains, fire hydrants, valves and property connections, while wastewater renewals include 2.1km of wastewater rising main pipeline through hot ground from Tokaanu to the tailgate bridge on SH41. An upgrade of the main Tokaanu pump station will be completed concurrently by a separate contractor.